LOW ELEVATION BALLAST STRUCTURE
HIGH ELEVATION BALLAST STRUCTURE
- This a low lying structure and hence the windloads are dramatically lesser compared to an elevated structure
- A wind shield is provided which enables aerodynamic design capable of taking windloads of 180 Kmph
- Premium materials like Pre-galvanized steel for purlins and Aluminium clamps for module mounting are used and hence highly durable
- This is compatible for any module type
- Since it is a modular structure, Installation involves only nut and bolt mechanism And can be done by unskilled personnel also
- Installation via s-sol Fix will take a days time and hence final project completion is much quicker unlike the conventional structure. 100 KW can be easily Installed in One day.
- There needs no penetration into the roof
- A concrete ballast is provided for counter weight. Casting the concrete blocks is the only in-situ work which needs be done, which is very minimal and not at all labor intensive
- There are no point loads acting on the roof and hence no need to compromise with the structural integrity of the existing building roof unlike the penetrative structures